X

ASK Gypsum Factory 球磨机执行进度表(叙利亚)

  1. 2019.11.16 合同签订
2019.11.16 Customers place purchase orders.
以电汇30%预付和70%根据提单副本付款的付款方式签订合同。
Payment Terms: 30% in advance and 70% by transfer against BL and shipping docs copies.
  1. 2019.12.15 收到定金30%,开始安排生产
2019.12.15 Received the deposit and start to arrange production.
  1. 2020.04.14 报关, 订舱
2019.04.14 Clearance of goods, Booking space
  1. 2020.04.14 验货
2020.04.14 Inspection of goods
  1. 2020.04.16发货
2020.04.16 Shipping
Links:Medical